3D STICK-ON TILES INSTALLATION

Chevron Tile Installation Guide

Follow these steps to install your chevron peel and stick tiles with a clean, aligned finish.

DIY Difficulty Easy
Easy
Moderate
Advanced

This shape requires minimal cutting and is easy to align, making it a friendly choice for most DIY projects.

Step 1 - Clean the surface
Step 01

Clean the Surface

Wipe the wall clean before installation. Make sure the surface is dry, smooth, and free from dust, oil, or loose paint.

Step 2 - Measure and mark
Step 02

Measure and Mark

Before peeling the backing, use a level and pencil to mark a straight guide line on the wall. This helps keep each tile sheet aligned.

Step 3 - Overlap the side edge
Step 03

Overlap the Side Edge

When placing the next sheet, fully overlap the grout-line edge of the previous sheet. The green marked area shows the edge that should be covered, helping create a correct and evenly spaced grout-line look.

Step 4 - Cut if needed
Step 04

Cut If Needed

The tile sheet can be cut easily. Trim around corners, outlets, edges, or narrow spaces with scissors, a utility knife, or other cutting tools.

Step 5 - Overlap top and bottom
Step 05

Overlap Top and Bottom

When installing the next row, fully overlap the top or bottom grout-line edge. The green marked area shows the edge that should be covered, helping keep the pattern connected and the grout-line look even.

Step 6 - Finished installation
Step 06

Enjoy the Finished Look

Once all sheets are aligned, overlapped, and pressed firmly, your chevron tile backsplash is complete. Enjoy the refreshed wall.